|
SMITH ASSOCIATES |
|
ARCHITECTS,
P.A. |
A significant portion of the firm's projects
involve commercial renovation projects. Below is a
list of those with State agencies.
- Arkansas Department of
Education
Contact Joe Teeter, Arkansas Department of Education.
- Renovation of Buildings A through D on the State Capitol Mall to comply with Americans
with Disabilities Act Architectural Guidelines (ADAAG).
Budget: $180,000
Contractor:
David Paul Builders, Inc.
- Arkansas School for the
Blind
Contact Jim Hill, Arkansas School for the Blind
- Administration Building HVAC Renovation. Scope includes replacing the heating and cooling
systems with new four-pipe system with fan coil units.
Budget: $1,300,000.
Contractor:
Lantrip Construction, Inc.
- Renovation of Vocational Building to comply with ADAAG. Scope included installation
of a new elevator, ramps, accessible bedrooms and bathrooms.
Budget: $200,000.
Contractor:
David Paul Builders, Inc.
- Cafeteria Renovations. Scope included reorganizing and replacing kitchen
equipment, creating a new serving line and updating finishes.
Budget: $160,000
Contractor:
Siems, Inc.
- Waterproofing: Administration and Fine
Arts Buildings. Scope included
pointing masonry surfaces, repairing flashings and below grade
waterproofing.
Budget: $100,000.
Contractor:
Roberts-McNutt Waterproofing
- New fire alarm system in five buildings.
Budget: $75,000
Contractor:
Arnold Blevins Electric Co., Inc.
- Paving and sidewalk repairs.
Budget: $75,000
Contractor: Peneprime of Arkansas, Inc.
- Arkansas School for the
Deaf
Contact Stan Bryant, Arkansas School for the Deaf
- Parnell Hall HVAC Renovation. Scope includes replacing heating
and cooling systems with new four pipe system and fan coil units.
Budget: $1,000,000
Contractor: Lantrip Construction, Inc.
- New basketball floor at Gymnasium building. Scope included
overlaying the basketball urethane floor with wood floor system.
Budget: $125,000
Contractor: Wood Floor Finishers, Inc.
- Roofing Student Services
and Physical Education buildings. Scope included replacing original ballasted roofing
with new insulation and torch applied modified bitumen membrane.
Budget: $100,000
Contractor: Wheeler Construction, Inc.
- Waterproofing: Vocational
Building and Cafeteria.
Scope included pointing and sealing masonry surfaces, painting
steel windows and resealing glass panels.
Budget: $100,000
Contractor: Roberts-McNutt, Inc.
- Waterproofing: Central
Supply Building.
Scope included pointing and sealing masonry surfaces, replacing
deteriorated wood trim, replacing roll roofing with torch applied
modified bitumen membrane, and painting.
Budget: $75,000
Contractor: Arrow Construction, Inc.
- Bleacher repairs. Scope included retrofitting manual
operating wood bleachers with motorized devices to automate bleacher
operation.
Budget: $20,000
Contractor:
RJ Love Enterprises, Inc.
- Paving repairs.
Budget: $75,000
Contractor: Peneprime of Arkansas, Inc.
- University of Arkansas
at Monticello
Contact Mark Davis, University of Arkansas at Monticello
- Renovation of Bankston
Hall. Scope includes
renovating toilet facilities in a men's residence hall.
Budget: $500,000
Contractor: Southeast Building Concepts.
- Renovation of Horsfall
Hall. Scope includes replacing
heating system with new four pipe heating and cooling system
and fan coil units. Scope also included replacing aluminum retrofit
windows with steel sash windows resembling the original sashes.
Budget: $1,400,000
Contractor: Arrow Construction, Inc.
- Renovation of Royer
Hall. Scope of
work included repairing bath facilities, creating accessible
bedrooms, bathrooms, and laundry facilities, waterproofing and
roofing.
Budget: $280,000
Contractor:
Jim Wood Company, Inc.
- University of Arkansas
for Medical Sciences
Contact Randy Perry, University of Arkansas for Medical Sciences
- Waterproof Jeff Banks Dormitory building
Budget: $50,000
Contractor:
Western Waterproofing, Inc.
- Roofing Child Development Center.
Budget: $90,000
Contractor: Barrow Roofing, Inc.
- Roofing Family Center
Budget: $50,000
Contractor:
All Seasons Roofing, Inc.
- Arkansas Employment Security
Department
- ADA Renovation
of Administration Building
Budget: $100,000
Contractor: Austin Construction, Inc.
- ADA Renovation of Pine Bluff and Monticello local
offices.
Budget: $75,000
Contractor: MACO, Inc.
- ADA Renovation of Searcy local office.
Budget: $50,000
Contractor: MACO, Inc.
- Arkansas Parks and Tourism
- Education Pavilion
Toltec Mounds Archeological State Park
Budget: $360,000
Contractor: Noral Contracting, LLC
- ADA Renovation of Visitors Information Center
Pinnacle Mountain State Park
Budget: $125,000
Contractor: Jack Morgan Construction, Inc.
- Waterproofing Plantation
Agricultural Museum
Budget: $50,000
Contractor: Hills of Arkansas, Inc.
- Arkansas State Building
Services
- ADA Renovation MAC Facility
State Capitol Mall
Budget: $150,000
Contractor: David Austin Construction, Inc.
- ADA Renovation
1000 Center Building
Budget: $100,000
Contractor: Baldwin & Shell Construction,
Inc.